Houses, Additions and Alterations
New homes, additions and structural alterations usually need a building permit. Planning approval, onsite wastewater approval and bushfire information may also be required.
Common Projects
- new houses and grouped dwellings
- extensions, verandahs and structural alterations
- ancillary dwellings, sometimes called granny flats
- internal alterations that affect structure, fire safety, exits or building classification
- converting a non-habitable building or room to habitable use
- earthworks, retaining walls, water tanks and stormwater works associated with the project
Start with the Site
Check zoning, setbacks, existing approvals, easements, access, levels, stormwater, servicing and whether the land is bushfire prone. W
here sewer is unavailable, coordinate the dwelling design with the approved onsite wastewater system.
Design and Certification
Your designer and building surveyor should confirm the building classification and applicable National Construction Code requirements.
Engineering, energy efficiency, smoke alarms, waterproofing, termite management, glazing and bushfire construction may need to be documented.
Ancillary Dwellings
An ancillary dwelling is self-contained accommodation on the same lot as another dwelling.
Planning exemptions and standards have specific conditions.
Confirm whether development approval is required and how water, wastewater, parking, access and bushfire requirements will be addressed.
Do Not Use a Shed as a House Without Approval
A shed or other Class 10 building is not approved for residential occupation.
Converting it to habitable use can require planning approval, a building permit or retrospective approval, engineering and substantial upgrades.
Approval is not guaranteed.